Abbreviations:
CO = Cast On
C1, C2 = Contrast colors
DPN = Double Pointed Needles
K = Knit
K2tog = Knit two stitches together, this decreases two stitches to one stitch.
K3tog = Knit three stitches together, this decreases three stitches to one stitch.
K4tog = Knit four stitches together, this decreases four stitches to one stitch.
KFB = Knit in front and back of the same stitch, this creates two stitches from one stitch.
MB1, MB2 = Make Bobble (see stitch glossary)
MC = Main Color
P = Purl
PM = Place Marker
Rnd, Rnds = Round, Rounds
SSK = Slip st, slip st, and knit the two stitches together, this decreases two stitches to one stitch.
St, Sts = Stitch, Stitches
W & T = Wrap and Turn
Stitch Glossary:
The bobbles are worked into 1 st before moving onto the next st in the rnd.
MB1 = KFB, KFB, turn and P4, turn and K4tog.
MB2 = KFB, KFB, turn and P4, turn and K4, pull stitches over to decrease from 4 to 1 st.
Techniques:
I-cord:
The set amount of sts are knitted from one needle to a second needle. Do not turn the needle with sts around, just push the sts to the beginning of the needle and knit again. This technique makes a tube.
Short Rows: Short rows are used to add extra length or dimension to your knitting only on part of your work. Short rows are worked within regular rows by adding the W & T and then changing the direction of your knitting to reach another W & T.
You work a set amount of stitches, then perform the W & T, then continue in the opposite direction and work another set amount of sts, then perform another W & T, and continue in the original direction to the end of the row.
Here is a link to great tutorial: Link
INSTRUCTIONS:
When casting on leave a longer tail to be used for sewing.
First Clue:
XXX:
With the C1 yarn and DPN, CO on 6 sts. PM on the first st and begin working in the rnd.
Rnd 1: Knit
Rnd 2: KFB 6x (12 sts total)
Rnd 3: Knit. Attach MC.
Rnd 4: (K1 in MC, K1 in C1) 6x. Cut off C1. Continue with MC only.
Rnds 5 – 6: Knit
Rnd 7: (KFB, K4, KFB) 2x (16 sts total)
Rnd 8: Knit
Rnd 9: (KFB, K6, KFB) 2x (20 sts total)
Rnd 10: Short row section:
Short Row 1: K5, W&T
Short Row 2: P10, W&T
Short Row 3: K8, W&T
Short Row 4: P6 W&T
Short Row 5: K23
Rnd 11: MB2, MB1, K16, MB1, MB2
Rnd 12: Knit
Rnd 13: Short row section:
Short Row 1: K4, W&T
Short Row 2: P8, W&T
Short Row 3: K6, W&T
Short Row 4: P4 W&T
Short Row 5: K22
Rnd 14: K9, K2tog, K9 (19 sts total)
Rnd 15: K9, K2tog, K8 (18 sts total)
Rnds 16 – 20: Knit
Rnd 21: K6, KFB, K4, KFB, K6 (20 sts total)
Rnd 22: K6, KFB, K6, KFB, K6 (22 sts total)
Rnd 23: K6, KFB, K8, KFB, K6 (24 sts total)
Rnd 24: Knit
Rnd 25: KFB, K5, KFB, K10, KFB, K5, KFB (28 sts total)
Rnd 26: Knit
Rnd 27: KFB, K6, KFB, K12, KFB, K6, KFB (32 sts total)
Rnd 28: Knit
Rnd 29: Short row section:
Short Row 1: K23, W&T
Short Row 2: P14, W&T
Short Row 3: K12, W&T
Short Row 4: P10 W&T
Short Row 5: K8, W&T
Short Row 6: P6 W&T
Short Row 7: K19
Rnd 30: Knit
Rnd 31: Short row section:
Short Row 1: K23, W&T
Short Row 2: P14, W&T
Short Row 3: K12, W&T
Short Row 4: P10 W&T
Short Row 5: K8, W&T
Short Row 6: P6 W&T
Short Row 7: K19
Next clue: January 25th 2021
Have fun knitting.
No comments:
Post a Comment